Shelbourne Hotel Wellness Centre Dublin
Back to Projects
Features:
Refurbishment of the Wellness Centre in the Shelbourne Hotel to provide Pool, Treatment Rooms and more
The project at the Shelbourne Hotel in Dublin called for the refurbishment of the Wellness Centre to incorporate a new swimming pool, sauna and steam rooms, treatment rooms, and fitness areas, including cardiovascular equipment. New changing rooms were also provided for the facilities.
Existing live Mechanical and Electrical Services serving the bedroom wings, which ran through the site, were required to be maintained and protected throughout the works. This was to ensure that the Hotel could maintain its service provision throughout the duration of the contract. The project was initiated in 2012 and completed in 2013.
Services provided by JV Tierney & Co. included:
- New Air Handling Plant with Heat Exchange
- New Swimming Pool Water Filtation Equipment and Re-testing of Existing Pool Deck and Water Channels
- Entertainment System for Salon Treatment Rooms Including iPod Docking Stations
- Mechanical Ventilation throughout including specialist system for Pool Hall, including Heat Recovery on all air systems.
- Domestic Water services throughout, inclusive of Water Conservation measures and Usage Metering.
- LPHW Heating Distribution for the air systems.
- BIMS provision for monitoring and control of all new items of plant and equipment, including metering on heating circuits, gas and water systems.
- Extension to existing Fire Detection and Intruder Alarm and CCTV systems.
- Modifications to existing Lift Installation including new landing entrance.
- New Music and PA system
Contact Us






