Outpatient Department Phase 1, Merlin Park University Hospital

#

Back to Projects

Our Role

Mechanical, Electrical, Sustainable & Energy-Efficient Design Engineers

Project Type

Project Value

Features:

Phase 1 of the Outpatients Department at MPUH, Galway

The Outpatients Department building is an enabling works project for the Emergency Department and Women’s & Children’s Hospital Galway. It involves the provision of a two-storey building on the Merlin Park University Hospital site for the relocation of OPD facilities from University Hospital Galway. The building is a 1,140m2 total area consisting of treatment, consultation, staff rest, office & WC rooms, and is designed to allow for future expansion with a four-storey extension adjoining. A NZEB (Near Zero Energy Building) compliance analysis model was carried out using IES (Virtual Environment) software, based on the Architectural and Building services design. The building achieved a Building Energy Rating of A3.

Sustainable Design:

  • Efficient use of natural light to offset the use of artificial light.
  • Natural Ventilation of spaces to minimise energy consumption. To facilitate this, top hung window sections were provided at the end of the corridors on each wing of the building. These are automated by an intelligent control system for efficient control during winter conditions based on user defined setpoints for CO2 and Temperature. This keeps the corridor ventilated and fresh without putting excessive demand on heating systems.
  • Variable Speed Drives on all major plant items.
  • High Efficiency Heating Plant.
  • An automatic dimming function on the Lighting System for switching of lights to save energy when daylight is available.
  • Automatic Presence Detection of Lights in areas which are intermittently occupied.
  • High Efficiency Light Fittings.
  • Building Energy Management Systems (BEMS)
  • As the building is designed to meet NZEB requirements and in line with the HSE Climate Action Plan Targets all heat generating plant in the building is electrically powered. Air Source heat pumps provide the main heat source in conjunction with a Water Source Heat pumps for hot water generation to satisfy the Buildings NZEB renewable energy requirements.

 

Contact Us

Get in touch with us:

Email Us

Call Us

00 353 1 421 4900