Nenagh Community Nursing Unit

#

Back to Projects

Our Role

Mechanical, Electrical, Sustainable & Energy-Efficient Design Engineers

Project Type

Project Value

€15M

Features:

State of the Art Community Nursing Unit in Nenagh

Nenagh CNU consisted of the construction of a new purpose build 50 Bedroom Nursing Unit on the site of Nenagh Hospital in Tipperary. The new building is approximately 4674m2 and includes the Admin Block and a Commercial Kitchen. This is Phase One with a possible second 50 bed unit in Phase Two.

The new building is divided into 2 Households with 25 Bedrooms in each Household. Each Household contains a Dining Room located adjacent to an external Courtyard. There are also Day/Sun rooms, Activity rooms, Treatment rooms, a Hairdresser room, a Shop Area and a Meeting room throughout the new Nursing unit.

  • BER Rating A3
  • Efficient use of natural light to offset the use of artificial light
  • Natural Ventilation of spaces to minimise energy consumption
  • Variable Speed Drives on all major Plant Items
  • High Efficiency Heating Plants
  • Heat Recovery on Mechanical Ventilation Systems
  • An automatic dimming function on the Lighting System for switching of lights to save energy when daylight is available
  • Automatic Presence Detection of Lights in areas which are intermittently occupied;
  • High Efficiency Light Fittings
  • Building Energy Management Systems (BEMS) coupled with metering of Plant for optimum control of energy use and link to Energy Monitoring System
  • Polycrystalline Photovoltaic (PV’s) technology utilised along with Heat Pumps to satisfy the Building’s NZEB’s renewable energy requirements.
  • A NZEB (Near Zero Energy Building) compliance analysis model was carried out using IES (Virtual Environment) software, based on the Architectural and Building services design.

Contact Us

Get in touch with us:

Email Us

Call Us

00 353 1 421 4900