Croke Park National Stadium Dublin

#

Back to Projects

Our Role

Mechanical Electrical & Sustainable Design

Project Type

Project Value

€135M

Features:

Winner – Gold Medal – RIAI Awards 2009

Winner – Regional Award – RIAI Awards 1997 Award

Winner – ACEI Design Excellence Awards 1996

Winner – Construction Excellence – CIF Awards 1995

Croke Park forms one of the major construction icons on the north side of the city of Dublin.  It is designed to the highest standard of sports stadia in Europe with a seating capacity of 82,500.  The stadium consists of full entertainment specifications to allow for all sporting activities from minor games with minimum spectator value, to major sporting and corporate events as well as concert events with the grandstand and pitch used for spectators.

The initial design concept of the stadium was that it would be built in a 3-phase approach without any interruption to the holding of any major sporting events during both the demolition of the existing stadium and construction of the new stadium.  The final design of the stadium was in addition to allow for full horizontal circulation over three sides and over seven levels.

As the largest sporting venue development undertaken in Ireland to date, it was essential that precise detailed design was created from the outset with both practical and economic system services provided for an ultimate building footprint of 142,000m² excluding the playing field.

Services provided by JV Tierney & Co. included:

  • Voice Evacuation Fire Alarm System
  • Skybridge Installation, specifically electrical services such as the emergency lighting, general lighting, and lift installation.
  • Museum Fit-out with interactive services and fully air-conditioned
  • Fully programmable flood lighting management system with 9 No. floodlight settings for 3 No. main sporting occasions, GAA sports, soccer, rugby.  All floodlighting running independently of stadium power source on synchronized generators (4 No. 640kW).
  • Provision of lighting systems throughout the stadium including lighting management and energy efficient controls infrastructure
  • Event Control Room with full security and monitoring facilities for the whole stadium
  • Vertical Transport – 8 No. lift installations including dedicated presidential lift and media press lift and Escalator installation to upper levels
  • Pitch aeration system with the use of a large single fan and herringbone below ground ducting system.  Fan rated for 450kW with slow start of 800 a/ph
  • Full BMS compatible distribution network for lighting, electric heating and air systems
  • Complete heating/ventilation and water services installations throughout

Contact Us

Get in touch with us:

Email Us

Call Us

00 353 1 421 4900