Bonmahon Coast Guard Station
Back to Projects

Our Role
Mechanical, Electrical & Sustainable Design

Project Type

Project Value
€5.2M
Features:
First New Coast Guard Building Since 2014 to Provide State-of-the-Art Facilities
The Bonmahon Coast Guard Station marks the first new Coast Guard building since 2014, providing a much-needed facility to service the volunteers in Bonmahon. The new, 272m² station provides state-of-the-art facilities, including training rooms, operations rooms, IT Comms Room / Radio Desk, a garage for three Cliff Rescue Vehicles, plant room areas, external services compounds, kitchen, shower and changing rooms, and office space.
JV Tierney & Co. were appointed by the Office of Public Works (OPW) to provide the design and project management for all of the Mechanical, Electrical, IT, and Sustainable Design Services for the development, including:
- Full Mechanical, Electrical, and Sustainable Design Services from initial conception planning phase through to final commissioning and handover.
- Close liaison with the Office of Public Works to ensure timely, high quality delivery of project.
- Enhanced Energy Consumption and Monitoring Building Energy Management System (BEMS) and Metering System.
- BER Rating of ‘A2’ achieved.
- Centralised plant room consisting of Air Source Heat Pump providing Low-Pressure Hot Water and Domestic Hot Water to building.
- Broadcast Lighting Control System with automatic dimming and presence / absence detection of lights in areas which are intermittently occupied.
- Enhanced thermal fabric properties and air tightness level of 4.44m³/hr.m²,
- Thermal Modelling and Overheating Analysis.
- Natural Ventilation.
- Mutli-functional submetering, heat meters, hot and cold water meters, and electrical boards meters, to monitor, collect, and collate operating data.
- EV Chargers installed on-site.
Contact Us




